Bricklayers Insurance from £8.70/month

From £8.70/month. Compare bricklayers insurance from 200+ UK insurers. Tailored cover, free quotes in minutes. FCA regulated broker since 1983.

Bricklayers need public liability rated for work at height, employers' liability for any gang or labour-only subcontractors, and contract works cover if they are responsible for materials and work in progress. A gap to check is the subcontractor question: a labour-only gang is usually treated as employees, and employers' liability is legally required.

Cover this trade usually needs

CoverWhy it mattersTypical limit
Public liabilityInjury to the public and damage to property from site work, falling materials and scaffolding£2m–£5m; £5m usual for main-contractor sites
Employers' liabilityLegal requirement for your gang — falls from height and manual handling£10m (legal minimum £5m)
Tools and equipmentMixers, saws and kit stolen from vans and sitesFull replacement value
Contract worksWork in progress — a wall down in a storm before handoverMatched to largest contract value
Personal accidentWeekly benefit if you are injured — no work, no payMatched to your income

Key risks

  • Materials or tools fall from a scaffold and injure someone below.
  • A member of the public is hurt near the site or the skip.
  • A wall collapses in high wind before it is tied in and handed over.
  • A labourer falls from height — the biggest employers' liability exposure in the trade.
  • You damage the client's existing property — a broken window, a cracked drive.

Regulations and licences

  • Work at Height Regulations 2005 for scaffold and platform work.
  • CDM 2015 duties on construction projects.
  • CIS status for subcontractors, which decides who counts as an employee for insurance.

What we check before quoting

  • Maximum working height and whether you erect your own scaffold.
  • Employed gang, labour-only subcontractors or bona-fide subcontractors — the split decides employers' liability.
  • Whether you supply materials and are responsible for work in progress.
  • Any structural work — lintels, RSJs, underpinning — which is rated differently.
  • Your largest single contract value.

Gaps we see most often

  • Labour-only subcontractors not declared, so employers' liability is missing when legally required.
  • Work at height above the policy's limit — many standard policies cap at 10 metres.
  • No contract works cover, so storm damage to unfinished work is your loss.
  • Structural work like lintel replacement not declared on a 'bricklaying' schedule.

Limits clients and contracts usually ask for

  • Public liability £2m–£5m; £5m is the usual main-contractor requirement.
  • Employers' liability £10m (the legal minimum is £5m).

Key facts and sources

  • HSE's provisional figures record 126 workers killed in work-related accidents in Great Britain in 2025/26, with construction and agriculture together accounting for over a third, and falls from height the most common kind of fatal accident at around a quarter. HSE — Work-related fatal injuries in Great Britain, 2026
  • The Construction (Design and Management) Regulations 2015 place legal duties on clients, designers and contractors on construction projects in Great Britain, including domestic work. Domestic client duties normally transfer to the contractor or principal contractor. legislation.gov.uk — CDM Regulations 2015

Preserve the evidence before masonry is concealed

For walls requiring temporary support, identify who designs the support and who authorises each construction stage before the gang starts. HSE's Great Britain guidance describes temporary works as planned and managed engineered solutions, including propping walls and floors. Keep the relevant design, revisions and site acceptance records together. Do not assume that the scaffold contractor's involvement transfers responsibility for the stability of newly built masonry, especially where support arrangements change as other trades advance their work.

Photograph wall ties, cavity trays, damp-proof details and movement-joint locations before they disappear behind subsequent courses or finishes. Link photographs to drawing revisions and the actual elevation rather than storing an unlabelled collection of site images. Record instructions where openings, lintels or service penetrations change. These documents can help a broker and appointed investigator distinguish an installation allegation from an architectural detail, supplied component or later alteration, without implying that photographs alone prove compliant construction.

Agree how weather protection and incomplete walls are handed over at the end of each shift. Record who can remove bracing or load fresh masonry, and preserve any instructions following high winds or interrupted construction. If a wall fails, retain accounts of the sequence and condition before debris is removed, subject to urgent safety needs. Separate emergency stabilisation costs, rebuilding your work and damage to adjacent property when asking the broker about notification and claims handling.

Before agreeing to rebuild a disputed elevation, obtain a written defect description and retain samples or test reports where competent advisers recommend them. Identify whether the demanded remedy includes matching unaffected brickwork, access scaffolding or relocating occupants. Those costs may be disputed independently of the workmanship allegation. If your contract changes from laying to another designer's details into choosing structural or temporary-support details yourself, notify the broker and seek appropriate technical advice before accepting that expanded role.

HSE — Temporary works

Common questions

Is my labour-only gang covered as subcontractors?
No — labour-only subcontractors working under your direction are generally treated as employees, which means employers' liability is legally required for them. Bona-fide subcontractors with their own insurance are the exception. We check how your gang actually works.
Am I covered if a wall blows down before handover?
Only with contract works cover. Public liability covers damage to other people's property, but your own work in progress and materials need contract works — otherwise a storm means paying for the bricks and labour twice.
Does my policy cover me at any height?
No — most policies have a height limit, often 10 metres. If you work above that, or on certain scaffold types, it must be declared or claims from that work will be declined.
What if I knock through for a lintel or RSJ?
That is structural work, and it is rated differently from straightforward bricklaying. If your schedule says 'bricklaying' and the claim arises from structural alteration, it may not be covered. Tell us everything you do, even occasionally.

Bricklayers insurance — commercial trade cover from a UK broker

If you work as a bricklayers contractor in the UK, the right insurance programme depends on who hires you, what you carry on site, and the contract terms you're asked to sign. Premier Insurance has been broking trade and contractor risks since 1983, and we structure cover around the way you actually operate — main-contractor work, sub-contracted labour, principal-contractor duties, or direct-to-client jobs. Speak to a real broker on 020 8908 2426 or message us on WhatsApp 07954 331362.

What bricklayers cover typically includes

Cover for bricklayers contractors can include any of the elements below. Not every policy carries every section, and limits, conditions and excesses vary by insurer and risk — we use the conversation to scope what you actually need:

  • Public liability — third-party injury or property damage arising from your work; limits are commonly arranged from £1m, with higher limits available where a contract specifies them.
  • Employers' liability — legally required in the UK if you employ staff, including most labour-only sub-contractors; the statutory minimum is set by the Employers' Liability (Compulsory Insurance) Act 1969.
  • Contract works / contractors' all risks — physical damage to the works in progress and to your own materials on site.
  • Own plant and hired-in plant — cover for owned equipment and for the continuing-hire liability on plant you hire in.
  • Tools cover — theft or damage to hand and power tools, usually with conditions on overnight storage and vehicle security.
  • Professional indemnity — where you take on any design, specification or design-and-build element.
  • Personal accident — weekly benefit and capital sums for the principal and key staff, useful where there is no contractual sick pay.

Risks we see most often in bricklayers work

Across UK contractor portfolios, the recurring loss patterns are tool and plant theft (particularly from vans left on residential streets), damage to a client's existing structure during the works, and injury claims from sub-contracted labour with unclear status. None of these descriptions imply that any particular cover or exclusion sits on a named policy — that's always a wording question.

Why brokered cover beats price-comparison sites

Comparison sites push you toward the cheapest premium, not the policy that pays. Premier's brokers read the wording, flag exclusions before you buy, and stay involved at claim time. Rated 4.9 on Google · 100+ reviews, and a full BIBA member. For a tailored bricklayers quote, request a callback or email hello@premier-insurance.co.uk.

Related trade insurance from Premier

Speak to a UK insurance broker

Our brokers are available Monday to Friday 9am to 5:30pm. Call 020 8908 2426, message us on WhatsApp 07954 331362, or email hello@premier-insurance.co.uk. Visit our office at 49 Grosvenor Street, London, W1K 3HP. You can also request a callback or learn more about our team.